a square parking lot of 250m on a side. the surface of the lot is planar, sloping to one of its edges. along the downstream edge is a gutter, this gutter drains the entire lot and is sloped from both ends toward a sewer inlet at its center. the time of concentration of the lot is estimated to be 20 min, of which 18 min accounts for overland over the lot surface and 2 min accounts for travel down each half of the gutter.assuming the rational formula is applicable with a runoff coeeficient of 0.75 which of the following storms will yield the highest peak runoff? what will be the peak runoff rate in each case?

a)100mm/h for a duration of 10min

b) 25mm/h for a duration of 40min

c)15mm/h for a duration of 66.7 min

All Rights Reserved, usbestwriters.com
Disclaimer: You will use the product (paper) for legal purposes only and you are not authorized to plagiarize. In addition, neither our website nor any of its affiliates and/or partners shall be liable for any unethical, inappropriate, illegal, or otherwise wrongful use of the Products and/or other written material received from the Website. This includes plagiarism, lawsuits, poor grading, expulsion, academic probation, loss of scholarships / awards / grants/ prizes / titles / positions, failure, suspension, or any other disciplinary or legal actions. Purchasers of Products from the Website are solely responsible for any and all disciplinary actions arising from the improper, unethical, and/or illegal use of such Products.